Yes. Before any development is undertaken, it is essential that state and local standards be investigated. In the case of earth disturbance within 100 feet of a water resource, a permit may be required for excavating, filling, grading, placing riprap, maintaining or replacing structures including docks and retaining walls. Stormwater vegetated buffers, while not always required, are strongly encouraged to help prevent erosion and polluted runoff into water bodies.